Construction site calendar

With the roadwork information system, you can find out about the location of roadwork sites, as well as the type, duration and severity of possible roadwork-related traffic obstructions on federal, state and county roads before you start your journey. Full road closures or road works with a duration of at least one week are shown. eight calendar days.

All streets within Calw for which the City’s Highway Department has issued a traffic ordinance can be found directly in the listing below.

Restriction on the B 463

  • Regulation of traffic on the B 463 between Bad Liebenzell and Ernstmühl with a traffic light system
    Period: 05.06.2023 until incl. 29.09.2023
    Detour: none
    Regulation of traffic with a traffic light system due to a retaining wall renovation.

Full closure of the sidewalk and the bus stop at the ZOB

  • Full closure of the sidewalk and the bus stop at the ZOB at the level of the train counter/elevators (Bischofstr. 10)
    Period: 03.04.2023 until incl. 30.11.2023
    Detour: Alternatives exist for pedestrians.
    The speed in the work site area will be reduced from 50 km/h to 30 km/h.

Full closure Calw Stammheim, junction Silcherstraße / Hauptstraße

  • Full closure Calw Stammheim, junction area
    Silcherstraße / Main street

    Period 11.09.-02.10.2023
    Detour via Friedenstraße / Dr.-Barth-Straße

Due to a road rehabilitation in the Heinz-Schnaufer-Straße there will be closures here

  • Due to a road reconstruction in the Heinz-Schnaufer-Straße there will be closures here.
    Update: Closure of Heinz-Schnaufer-Straße in Heumaden
    Irregularities occurred during the paving of the asphalt in Heinz-Schnaufer-Strasse: The manholes are up to 4cm below road level. The construction company will repair this afterwards. As of Saturday, September 9, Heinz-Schnaufer-Strasse will be completely reopened. Unfortunately, there are still restrictions due to the securing of the low-lying shafts. The third construction phase will not take place until mid-October at the earliest due to additional civil engineering work (replacement of the fresh water pipeline).
    Bus traffic can resume regular service from Saturday until the start of the third construction phaseImportantnotice for residents and suppliers:
    All parked cars in Heinz-Schnaufer-Strasse must be removed.
    We ask for your understanding

    Construction stage 3
    BA 3 Heinz-Schnaufer-Strasse
    In the third BA, the rehabilitation will be completed up to the federal highway.
    Here, the fresh water supply is to be renewed beforehand on behalf of ENCW.
    The work is scheduled for completion in the fall of 2023.